List of equipments required for reconditioning of crossing and switches fabricated from 72 UTS or 90 UTS rails

List of equipments required for reconditioning of crossing and switches fabricated from 72 UTS or 90 UTS rails

Equipment required for (flux shielded) metal arc welding are listed below:

i) A portable welding generator DC set or AC set with 80 OCV or more

ii) Welding cables

iii) Electrode holder

iv) Ground clamp

v) Welding electrodes

vi) Pre-heating oven for electrodes

vii) Pre-heating arrangement for crossing body (torch)

viii) Gouging equipment

ix) Chipping hammer, wire brush etc.

x) Protective clothing including hand gloves, apron, shoes etc.

xi) Welding hand shield

xii) Magnaflux kit

xiii) Dye penetration testing kit

xiv) Tong testing

xv) Thermochalks

xvi) Grinders/Hand grinding Machine (preferably electric angle grinder or straight grinder)

xvii) Templates for finishing switches, crossings and SEJs after resurfacing by welding

xviii) Hammer ballpeen ½ kg. weight

xix) Wire feeder in case of flux cored continuous wire welding process

For CMS crossings :

i) All equipments mentioned above except pre-heating arrangement for crossing body at SL No. (vii)

ii) A water tank made of either masonry or steel plate walls of suitable size which can accommodate a crossing